Temane 450 MW Gas Project
The Globeleq-led Central Térmica de Temane (CTT) 450 MW gas-fired power project, located at Temane in Inhambane Province in Mozambique, will supply low-cost, reliable power to Electricidade de Moçambique (EDM) under a 25-year tolling agreement using natural gas supplied from the Pande-Temane Fields
WINNERGY SOLAR
Globeleq is the majority owner of the Winnergy 25 MWp solar plant located within Egypt’s flagship Benban Solar complex, near Aswan