Situated in Abidjan, Azito provides 25% of Côte d'Ivoire's baseload generation to CIE.

Situated near the coastal city of Kribi in Cameroon, Kribi Power sells electricity to ENEO the national utility company through a 20 year PPA.

Globeleq and Black Rhino are developing QIPP, a 540 MW CCGT gas fired power plant with associated 58 km 330 kV transmission line. Electricity will be sold to NBET and gas supplied by MPN, both under 20 year long term contracts.

Situated in Dar es Salaam, Songas provides electricity to the national grid and local industrial users.

The Globeleq-led Central Térmica de Temane (CTT) 450 MW gas-fired power project, located at Temane in Inhambane Province in Mozambique, will supply low-cost, reliable power to Electricidade de Moçambique (EDM) under a 25-year tolling agreement using natural gas supplied from the Pande-Temane Fields